The Standard for
Building Exteriors
High-rise glass, façade restoration, and waterproofing on occupied, secured buildings — planned with building security, documented from rig-up to closeout. The exterior work most vendors can’t handle.
Most vendors sell the squeegee. We sell the controlled operation around it — coordinated access, building security, minimal disruption, and a documented closeout you can hand to ownership.
Three pillars. Every job maps to one.
Access
Rope-access, swing-stage, BMU, and lift work — difficult-access exterior work on occupied high-rises, planned around the building and its tenants.
Swing stage
BMU operation
Lift & difficult access
Restoration
High-rise glass and façade brought back to standard — cleaned, restored, and reported, without disrupting the building’s operation.
Façade cleaning
Mineral-stain removal
Pressure washing
Protection
Sealing the envelope and keeping it sealed — waterproofing support and preventative programs that protect the asset over time.
Waterproofing support
Preventative programs
Condition reporting
Proof carries the pitch.
A facilities director isn’t buying clean glass. They’re buying coordinated access on a live building, controlled liability, and a record they can hand upward.
ONE Gas · Tulsa, OK · Rope access
On occupied, secured high-rises, the work is a risk decision before it’s a cleaning one. Coordinated access, minimal disruption, documented closeout — that’s the part we’re built for.
Clear scope. Safe access.
Documented completion.
Coordinated access
We plan rope, swing-stage, and lift access with building security, and work around tenants rather than through them.
Documented every job
Rig-up to closeout, in writing — a record ownership can rely on, and the reason every job becomes provable.
Partner, not vendor
Owner-led today, built on an operation serving building exteriors since 1999. Calm, specific, accountable. We set the reference other exterior vendors are measured against.
Kansas · Arkansas
Roots in Tulsa and Wichita. Active growth in the Austin market.
Request a Building Assessment
Tell us the building. We’ll come back with the access method, the safety plan, and the scope — no cost, no obligation.
Request received
Thanks — we’ll review the building and follow up within one business day.